- 2022Drip pan for recycling centre
- Charging facility for electric cars
- LED lighting
- IT module for paperless logistics department
- 2022Drip pan for recycling centre
- Charging facility for electric cars
- LED lighting
- IT module for paperless logistics department
- 2021Photovoltaic system 413 kWp
- Sprinkler system in logistics centre
- Renewal of roof with heat insulation in plastic injection moulding and tool design building
- 2020
LED lighting in plastic injection moulding building for teams 1 and 2
- Automatic window control for optimised ventilation for teams 3 to 6
- • Installation of fire alarm system in the plastic injection moulding plant, assembly, logistics, laboratory and technology
- 2019LED lighting for assembly 1, stationary gas analysis and tool design
- New water treatment for cooling water in the plastic injection moulding plant
- Replacement of heating circuit pumps with energy-saving pumpsn
- 2018Fire alarm system in the production area
- LED lighting for car park area of administration department
- New compressed air system in assembly
- 2017Reduced paper consumption thanks to SAP
- LED lighting in the technical building and canteen warehouse
- Replacement of pneumatic screwdrivers by electric screwdrivers
- Fire protection panels in the forklift charging area
- Technical overhaul of fire protection doors
- 2016LED lighting for goods receipt, dispatch, technology and outdoor facilities
- Circulation system for test bench for temperature changes
- Full renewal of the compressed air lines in the assembly area
- • Replacement of pneumatic screwdrivers by electric screwdrivers
- 2015Energy audit DIN EN 16247-1
- New insulated glazing windows in service department
- Conversion of the operating instructions to a new format
- Conversion to LED lighting in various areas
- 2014Studie "Energy Efficiency"
- Solar thermal energy system for service water
- Photovoltaic system 105 kWp
- Conversion to LED lighting in passageways and outdoor areas
- 2013Underfloor heating system in new training room
- Rainwater cistern 20,400 litres
- Conversion of lighting in preproduction (new light colour with mirror -> 50% energy saving)
- Two permanently installed measuring systems for measurement of consumption of compressed air
- Measuring system for measuring and optimising the energy consumption of plastic injection moulding machines
- Measuring system for detecting compressed air leaks
- 2012Tightness test of all wastewater pipes
- Hydraulic balancing of the entire heating system with Vario-Q valves
- • Insulated glazing windows in the intermediate building of the production hall
- 2011Downhole heat exchangers
- Underfloor heating system Lindenstraße 33
- Glazed entrance elements Administration
- Fire protection measures
- Fire alarm system laboratory and technology
- 2010Photovoltaic system 61 kWp
- Fire protection door
- Gas analyser for containers
- Outdoor silo for granular plastics
- Partition wall in goods receipt
- Heat insulation of facade of assembly hall
- 2009Photovoltaic system 171 kWp
- New windows in the staircase
- New roof with heat insulation in Amorbach
- 2008New roofs and windows for technology and administration buildings
- Heat insulation of facade of administration building
- New insulated heating pipes between brick building and technology building
- Solar system for hot water on the roof of the plastic injection moulding plant
- Smoke and heat extraction system in staircase of administration and technology buildings
- New compensation system in transformer station plastic injection moulding plant
- Fire protection measures
- 2007Redesign and recultivation of the outdoor areas
- Flood protection in the area of the production hall
- Smoke protection and smoke detectors in the tool store II
- 2006Replacement of single glazing by insulating glazing in the "tools and equipment making" hall
- Replacement of all basement windows by windows with insulating glazing
- Reporting the water levels of the Zaber river with the web-based event reporting system EMS 442
- Replacement of powder extinguishers by foam extinguishers
- 2005•Flood protection through earthmoving along the course of a brook
- Flood protection with sheet piling retaining walls at all doors and gates at risk
- Installation of surveillance cameras at recycling centre
- 2004Heating of the office extension through heat recovery from the compressor system
- Replacement of the cooling tower by a closed circuit cooling system for the plastic injection moulding plant
- 2003Expansion of the fire extinguishing system
- Energy savings with new granulate dryers
- 2002High-speed doors in the production halls
- Saving paper through electronic archiving
- Reduced water consumption due to installation of a recirculation system for laboratory tests